EVALUASI PROGRAM PEMBANGUNAN DI KOTA TERPADU MANDIRI TELANG KABUPATEN BANYUASIN
Abstract
This study examines how the Evaluation of Integrated Urban Development Programme in Independent Telang Banyuasin. The research variables consisted of contex, input, process and product.Design analysis using descriptive analysis method which is carried out through several stages: data reduction, conclusion and verification. With the unit of analysis of Manpower and Transmigration Banyuasin. Data were collected through library research, observation and interviews. Results of the study revealed that with the support of government Banyuasin for basic infrastructure development with empowerment of communities the KTM Telang is able to carry its potenty that district make it to be the new center of economy, the centeroy government administration, and speed the overall regional development. Disnakertrans Banyuasin is supported by 83 employees who are dominated by groups of the structural power. The composition of employees in terms of level of education, can be quite adequate, since most is a degree with strata 1 to strata 2. Sources of state budget funds amounting to Rp. 3.3 billion, -. In transport infrastructure since the year 2008 up to now has been absorbing the budget either through APBN and APBD Banyuasin outside the Central Budget and province are as follows covering Management Office, Building Business, Markets, Smart Houses, mosques and house Jaga, Islamic Center, Parks cities and Tugu KTM, Roads and Bridges concrete Pier concrete and office space, the Network for Clean Water, Electricity Network and Street Lights, Buildings Rice Milling Plane (RPM), House Wira Business, Building RO system, Gate KTM and Regions Seed Center. Telang KTM development program which is managed by Disnakertrans Banyuasin has not been maximized to various constraints faced such as lach of quality human resources and inadequate budget. In the future, the work program Disnakertrans still need to be organized better. Some things need attention to be followed all the parties in the development of KTM Telang: Need Improvement, Development Implementation Coordination and synchronization of all stakeholders related sectors location with Village Center Zone KTM KTM. Programs and Activities Implementation of Physical Development of 2020 has been implemented in accordance with the target. Regional Development Action Plan 2021 KTM Telang directed, among others, for the construction of roads, improvement of roads, construction of buildings, renovation of buildings, the installation of water pipes clean.
Full Text:
PDFReferences
Aminudin, M. (2007). Evaluasi Rencana Lokasi Pemindahan Terminal Induk KM 6 Banjarmasin. Yogyakarta: MPKD Universitas Yogyakarta.
Aprilia, H. (2009). Evaluasi Pelaksanaan Program Transmigrasi Lokal Model Ring I Pola Tani Nelayan di Bugel Kecamatan Panggang Kabupaten Gunung Kidul. Yogyakarta: MPKD Universitas Gajah Mada.
Arikunto, S. (2002). Prosedur Penelitian Suatu Pendekatan Praktik. Jakarta: Rineka Cipta.
Arikunto, S. (2007). Manajemen Penelitian. Jakarta: Rineka Cipta.
Budi Sutomo (2008), Studi Pengembangan Kota Terpadu Mandiri (KTM) Berbasis Potensi Agribisnis Masyarakat dan Kawasan Di Kawasan Transmigrasi Mesuji Kabupaten Tulang Bawang.
Herning Ratna Kusumawati (2011), Evaluasi Penetapan Kota Terpadu Mandiri di Sarolangun.
Lexi, M. (2000). Metodologi Penelitian Kualitatif. Bandung: PT Remaja Rosdakarya.
Meleong, L. (2001). Metode Penelitian Kualitatif. Bandung: PT Remaja Rosdakarya.
Nazir, M. (2003). Metode Penelitian. Jakarta: Ghalia Indonesia.
Siahaan, E. (2002). Filosofi Perencanaan Pembangunan Kota Sesuai Paradigma Baru di Indonesia, : Hakikat Ilmu Untuk Pemberdayaan dan Peningkatan Peran Serta Masyarakat.
Singaribun, M., & Effendi. (2006). Metode Penelitian Survey. Jakarta: Pustaka LP3ES Indonesia.
Singaribun, M., Effendi, & Sofian. (2001). Metode Penelitian Survei. Edisi ketiga. Jakarta: LP3ES.
Sondang. P, S. (2008). Administrasi Pembangunan : Konsep, Dimensi, dan Strateginya. Jakarta: PT Bumi Aksara.
Sudjana, N. (2006). Penilaian Proses Belajar mengajar. Bandung: PT Remaja Rosdakarya.
Sudjana, N., & Ibrahim. (2007). Penelitian dan Penilaian Pendidikan. Bandung: Sinar Baru Algensindo.
Sugiono. (2003). Metode Penelitian Administrasi. Bandung: Alfabeta.
Sugiyono. (2008). Metode Penelitian Pendidikan (Pendekatan Kuantitatif, Kualitatif dan R&D. Bandung: Alfabeta.
Sugiyono. (2009). Metode Penelitian (Pendekatan Kualitatif, Kuantitatif dan R&D. Bandung: Alfabeta.
Sumarjo. (2004). Transmigrasi Menyongsong Era Otonomi Daerah dan GlobalisasiEkonomi.
Supriatna, T. (2000). Strategi Pembangunan dan Kemiskinan. Jakarta: Rineka Cipta.
Sutopo, H. (2002). Metodologi Penelitian Kualitatif. Surakarta: UNS Press.
Sutopo, H. (2006). Metode Penelitian Kualitatif. Surakarta: UNS Press.
Tjokroamidjojo, B. (2000). Perencanaan Pembangunan. Jakarta: PT Gunung Agung.
Utomo, M. (2005). Tinjauan Kritis Kebijakan dan Implementasi Penyelenggaraan Transmigrasi.
Sumber Lainnya
Peraturan Pemerintah No 39 Tahun 2006 tentang Tata Cara Pengendalian danan Evaluasi Pelaksanaan Rencana Pembangunan
Kepmen Nakertrans No. 214 Tahun 2007 tentang Pedoman Umum Pembangunan KTM
DOI: https://doi.org/10.62128/jiads.v17i2.49
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 Ahmad Ridhuan Habena
_____________________________________________________________________________________________
Jurnal Ilmiah administrasi dan Sosial
Alamat Redaksi: Jl. Sukatani I, No.3, 8 Ilir, Kecamatan Ilir Timur II, Kenten 8 Ilir Palembang, Sumatera Selatan, Indonesia
Phone/Fax: (0711) 826043 Handphone: +62812-7433-616
email: lppmjurnalstiasn2023@gmail.com or publikasi@stiasatyanegara.ac.id

This work is licensed under a Creative Commons Attribution 4.0 International License.